国产成人精选视频69堂,红樱桃视频国产在线播放,亚洲国产在线精品一区在,国产乱码精品一品二品,日韩国产欧美精品在线,国产五月天综合激情在线,双性顶公交车h呻吟,亚洲高清国产拍青青草原,1国产女人高清完整视频,国产免费网站在线视频

Drilling number
Drilling number
  • International
  • Canada
  • US
  • 911

    Daily drilling / station

  • 194

    Daily drilling / station

  • 784

    Daily drilling / station

Crude oil prices
Crude oil prices
  • US crude oil
  • Brent
  • Latest price (USD / barrel): 78.78

    Highest:78.81 Lowest:76.22

  • Latest price (USD / barrel): 84.85

    Highest:85.34 Lowest:84

TOP
Product center

Products

Home > Products > Manifold > Well Testing Manifold

Products

Product name:Well Testing Manifold

Product introduction:The well tesing manifold is typically located on the rig floor, with other devices to evaluate the cement cementing quality, the cementing of foam cement and casing, as well as the collection of oil casing information, and provides flexible and variable flow control and well shut-in capability upstream of the process and measurement equipment during well test operations. The flow path on one side of the manifold has an adjustable choke and is used during well cleanup or draw down operations until a stable flow condition has been reached. The opposite side of the manifold houses positive, fixed-bean chokes that provide accurate flow control for predetermined flow rates under stable conditions. A full-bore bypass is incorporated through the center of manifold and can be used when choking downstream at the heater or open-flow conditions.

Product introductionTechnical ParametersApplication areasDownload certificate

Product description

The well tesing manifold is typically located on the rig floor, with other devices to evaluate the cement cementing quality, the cementing of foam cement and casing, as well as the collection of oil casing information, and provides flexible and variable flow control and well shut-in capability upstream of the process and measurement equipment during well test operations. The flow path on one side of the manifold has an adjustable choke and is used during well cleanup or draw down operations until a stable flow condition has been reached. The opposite side of the manifold houses positive, fixed-bean chokes that provide accurate flow control for predetermined flow rates under stable conditions. A full-bore bypass is incorporated through the center of manifold and can be used when choking downstream at the heater or open-flow conditions.

1.       Pipeline has a monitoring hole, timely monitoring of pipeline pressure, flow rate, temperature and so on;

2.       Adjustable choke valve can accurately regulate pipeline pressure and flow at any time;

3.       Manifold with a control cabinet, remote control, safe and reliable;

4.       Equipped gate valve adopts reliable single-plate gate valve, have passed PR2 certification, with reliable performance and durability.